Locus latest blogs
General
Who is Allowed to See it: Designing a European Control Tower Around Jurisdictional Access Limits
Multi-country visibility programmes are scoped on coverage and capped by permission. The four limits that decide what a European control tower may display, and what to specify before you procure.
General
A US CFO’s Guide to AI Investment in Last-Mile Delivery Efficiency: Proving the Savings Arrived
Building the business case is the solved half. Twelve months later, four confounders have invalidated the baseline you forecast against. How to attribute realized savings defensibly, and what to fix at approval time.
General
Delivery Promise Accuracy: The Last-Mile Efficiency Metric That Predicts Repeat Purchase
Your on-time rate is measured against a window operations set. Promise accuracy is measured against what the customer was shown at checkout. They are different numbers, and only one predicts whether they order again.
General
Which Integration to Fix First: Ranking Feed Risk by Irreversibility in 2026
Build-sequencing criteria rank integrations by SLA impact, volume, and lead time. An operating estate needs one more property: whether the decision a feed gates can be taken back.
General
Degraded Mode Dispatch: What Operations Should See When a Feed Goes Stale in 2026
A broken integration produces an error. A stale one produces a confident plan built on old state. What the dispatcher needs to see at the moment of decision, and how autonomy should respond to input quality.
General
Route Optimisation Saves Emissions You Cannot Report: The Scope 3 Counterfactual Problem in 2026
Routing data is not the reason you cannot report the emissions your optimisation saved. The number operations wants to claim is not the number Scope 3 permits. The methodology forks and counterfactual designs that survive assurance.
General
Continuous Route Re-Optimization has a Cost Per Re-Plan, Almost Nobody Prices it
Every re-plan a routing system pushes has a real unit cost in driver re-orientation, dispatcher time, sequence trust, notifications, and lost baseline. Here is how to price it and set a net-benefit threshold.
General
The Agentic TMS Migration Roadmap: Sequencing a Legacy Cutover Without SLA Risk
Sequence a legacy TMS cutover by reversibility rather than by architecture. Which functions to move first, the checkpoint that gates each phase, and why go-live timelines are set by dependencies.
Insights Worth Your Time